Saturday, August 16, 2014
Generator Move
Last week we decided to move the generator. While it was the quietest generator available (Cummins 20K Propane), it could still be heard from the patio. I spoke with the propane supplier and had them exchange the 500 gallon tank with a 1000 gallon tank. While bringing the new tank I also had them install it farther away from the cabin. With the proposed location being about a 150 feet away, we took the time to build a pad that would make it easier to service as well.
After the pad was constructed, I also had the installers dig a secondary trench to extend the service wire out to the new pad.