Monday, June 13, 2011

Main Floor is built

This past weekend we constructed most of the exterior walls. The exterior wall was left open till next weekend when we tie in the roof.  We moved pretty fast for just two of us (Tim and I) and we were able to build the loft as well.
















No comments:

Post a Comment